MYTILINEOS is the largest private company active in the entire spectrum of energy, from the development, construction and operation of thermal units and RES projects to the design and construction of electricity infrastructure projects, retail supply of electricity and natural gas, supply and trading of natural gas.

Objective

An upgrade of 6.5 kilometres of high-voltage overhead transmission line was required while keeping the lights on to other customers, plus the delivery of a network switching station and private substation that met two different standards.

Solution

Yurika installed the high voltage connection asset of distribution lines, switching station and substation. This included electrical cabling, telecommunications equipment, and the harmonic filter yard, eliminating unwanted harmonics to improve equipment performance and reduce energy costs.

To deliver on time and budget during the depths of Covid-19, Yurika adopted a flexible delivery model that fast-tracked purchasing and supply of goods to the site. The modular switch room, for example, was built in Brisbane and transported to Junee.

A geographical resourcing strategy saw several key personnel relocate to the region, while dozens of local jobs were also created.

Outcomes

  • Green and regional growth
  • 30MW, 96,000-panel solar panel solar farm on 80 hectares of land
  • 6.5-kilometre upgrade of 66kV high-voltage overhead lines to dual fibre optic cable
  • A three-way 66kV switching station that meets two sets of standards
  • A 10-year power purchase agreement supplies Coles with renewable energy.

Yurika completed the project in August 2020 – on time and budget – and the multi-dimensional solution is already delivering big dividends.

The 96,000 solar panels on the farm operate as a single-axis tracking system, following the sun during the day to maximise energy generation. The farm powers grocery stores around the country and has been designed with spare capacity as Australia’s energy mix evolves.

Balancing three different elements was challenging – but achieving our client’s ambitions makes this a stand-out project.

Related reading

Interested in these services?

Related reading

Energy & Infrastructure
EHV, HV & MV infrastructure
Transmission & Distribution
Timeline
2020
Service
High Voltage Grid and Solar Farm Connection
Location
Junee, NSW
30MW, 96,000-panel solar panel solar farm on 80 hectares of land
6.5-kilometre upgrade of 66kV high-voltage overhead lines to dual fibre optic cable
A three-way 66kV switching station that meets two sets of standards
A 10-year power purchase agreement supplies Coles with renewable energy.
contact us
Get grid connected
Meet the team

Customer

MYTILINEOS is the largest private company active in the entire spectrum of energy, from the development, construction and operation of thermal units and RES projects to the design and construction of electricity infrastructure projects, retail supply of electricity and natural gas, supply and trading of natural gas.

Objective

An upgrade of 6.5 kilometres of high-voltage overhead transmission line was required while keeping the lights on to other customers, plus the delivery of a network switching station and private substation that met two different standards.

Solution

Yurika installed the high voltage connection asset of distribution lines, switching station and substation. This included electrical cabling, telecommunications equipment, and the harmonic filter yard, eliminating unwanted harmonics to improve equipment performance and reduce energy costs.

To deliver on time and budget during the depths of Covid-19, Yurika adopted a flexible delivery model that fast-tracked purchasing and supply of goods to the site. The modular switch room, for example, was built in Brisbane and transported to Junee.

A geographical resourcing strategy saw several key personnel relocate to the region, while dozens of local jobs were also created.

Outcomes

  • Green and regional growth
  • 30MW, 96,000-panel solar panel solar farm on 80 hectares of land
  • 6.5-kilometre upgrade of 66kV high-voltage overhead lines to dual fibre optic cable
  • A three-way 66kV switching station that meets two sets of standards
  • A 10-year power purchase agreement supplies Coles with renewable energy.

Yurika completed the project in August 2020 – on time and budget – and the multi-dimensional solution is already delivering big dividends.

The 96,000 solar panels on the farm operate as a single-axis tracking system, following the sun during the day to maximise energy generation. The farm powers grocery stores around the country and has been designed with spare capacity as Australia’s energy mix evolves.

Balancing three different elements was challenging – but achieving our client’s ambitions makes this a stand-out project.

Related reading

Interested in these services?

Related reading

Energy & Infrastructure
EHV, HV & MV infrastructure
Transmission & Distribution