![Building an EV charging network across Australia](https://www.yurika.com.au/wp-content/uploads/2024/04/Stratton-1-scaled.jpg)
3 May 2024
Building an EV charging network across Australia
Ampol partners with Yurika to establish national EV charging network.
![Efficient material sourcing and logistics for PNG project](https://www.yurika.com.au/wp-content/uploads/2024/01/LOW_RES_Yurika_2023_July_Warehouse_021-scaled.jpg)
11 January 2024
Efficient material sourcing and logistics for PNG project
Yurika's strategic approach and timely delivery drive Pacific Energy infrastructure project.
![Substation delivered in 14 weeks](https://www.yurika.com.au/wp-content/uploads/2022/01/feature-banner-our-projects.jpeg)
11 January 2024
Substation delivered in 14 weeks
This project was testimony to a combination of
experience, know how, an unwavering commitment to
deliver and a team that went above and beyond to
meet the 14-week challenge and successfully deliver
results to the client.
![Creating industry-leading metering technology for a marine environment.](https://www.yurika.com.au/wp-content/uploads/2022/01/card-metering-projects-ports.jpeg)
11 January 2024
Creating industry-leading metering technology for a marine environment.
Yurika developed an innovative and cost-effective metering solution to record the electricity and water consumption of berthed vessels at port.
![Future proofing rugby league club](https://www.yurika.com.au/wp-content/uploads/2023/12/Cowboys-Club-Townsville-4.jpg)
11 January 2024
Future proofing rugby league club
Yurika’s innovative design and cutting-edge smart solar technology helped the Cowboys Leagues Club tackle its energy costs and reduce their carbon footprint.
![Information portal for a national hotel chain](https://www.yurika.com.au/wp-content/uploads/2023/12/Metering-42.jpg)
11 January 2024
Information portal for a national hotel chain
Yurika provided a solution for a national hotel chain that specified how much gas and water was being used at each hotel so they could meet their compliance reporting obligations.
![Integrating renewable energy into remote communities](https://www.yurika.com.au/wp-content/uploads/2022/01/electrical-infrastructure-project-doomadgee3.jpeg)
11 January 2024
Integrating renewable energy into remote communities
Yurika delivered a renewable energy solution featuring secure remote monitoring capabilities that was integrated with the local power station and across multiple remote sites.
![Remote medical access](https://www.yurika.com.au/wp-content/uploads/2022/01/telecommunications-projects-video-conferencing3.jpeg)
11 January 2024
Remote medical access
High speed video link gives fast medical remote access.
![Sub-metering solution for a 30-storey high-rise](https://www.yurika.com.au/wp-content/uploads/2022/01/1000-1.jpeg)
11 January 2024
Sub-metering solution for a 30-storey high-rise
Yurika developed a sub-metering solution for the owner of a 30 storey high-rise that enabled them to measure and monitor the electricity consumption of each of their tenants.
![Building a world of opportunity with solar power solutions](https://www.yurika.com.au/wp-content/uploads/2022/02/EI-Junee-solar-farm-substation.jpg)
11 January 2024
Building a world of opportunity with solar power solutions
Yurika delivered the high voltage infrastructure for a 96,000-panel solar farm during a pandemic.
![Smart Connected Solar](https://www.yurika.com.au/wp-content/uploads/2022/03/20191215_Mater_Yurika-0005-1-scaled.jpg)
11 January 2024
Smart Connected Solar
Yurika designed, constructed and integrated a 452kW Smart Connected Solar solution, which included installation of 1,222 solar panels and 14 inverters, spread across five building rooftops.
![Connecting Council services](https://www.yurika.com.au/wp-content/uploads/2022/01/1000-2-1.jpeg)
11 January 2024
Connecting Council services
Yurika successfully increased client’s data speed from between 2 and 10 Mbps to 1 to 10 Gbps.
![Pay as you go (PAYG) meter replacement project](https://www.yurika.com.au/wp-content/uploads/2024/01/Yurika_2023_PPE-6-scaled.jpg)
10 January 2024
Pay as you go (PAYG) meter replacement project
Yurika assisted a large retailer and their existing customers.
![Powering retailers with solar energy](https://www.yurika.com.au/wp-content/uploads/2022/01/Robina_Town_Centre-panorama-view-low.jpg)
10 January 2024
Powering retailers with solar energy
Realised cost savings and delivered on QIC's commitment to sustainable energy solutions.
![Building sustainable regional infrastructure](https://www.yurika.com.au/wp-content/uploads/2023/10/Corowa-Control-and-Switchgear-Building-with-Harmonic-Filter-in-background.jpg)
20 October 2023
Building sustainable regional infrastructure
Renewables giant sees 30MW Corowa solar farm connected to the network to power retailers.
![Mega regional solar rollout](https://www.yurika.com.au/wp-content/uploads/2022/03/Yarrenlea-Solar-Farm-10.jpg)
19 October 2023
Mega regional solar rollout
Renewables giant sees 60MW Wagga Wagga Solar Farm connected to the network to power retailers.
![Queensland Electric Super Highway (QESH)](https://www.yurika.com.au/wp-content/uploads/2022/07/QESH-charging-stations-lineup-wide_long.jpeg)
8 November 2022
Queensland Electric Super Highway (QESH)
Build and operate the world’s longest electric superhighway in a single State.
![Connecting power stations to grid](https://www.yurika.com.au/wp-content/uploads/2024/01/Thomason-power-station.jpg)
13 July 2022
Connecting power stations to grid
A commissioned substation connection sees regional expansion