20 October 2023
Building Sustainable, Regional Infrastructure
Renewables giant sees 30MW Corowa Solar Farm connected to the network to power retailers.
19 October 2023
Mega Regional Solar Rollout
Renewables giant sees 60MW Wagga Wagga Solar Farm connected to the network to power retailers.
8 November 2022
Queensland Electric Super Highway (QESH)
Build and operate the world’s longest electric superhighway in a single State.
13 July 2022
Connecting Power Stations to Grid
A commissioned substation connection sees regional expansion
12 July 2022
Susan River Solar Farm Substation
Design, Construct and Transfer a 66kV/33 kV 74 MVA solar farm substation in nine months
27 June 2022
Substation upgrade
A commissioned utilities connection in Northern Territory (11kV augmentation)
25 March 2022
Powering retailers with solar energy
Realised cost savings and delivered on QIC's commitment to sustainable energy solutions.
24 March 2022
Smart connected solar
Yurika designed, constructed and integrated a 452kW Smart Connected Solar Solution, which included installation of 1,222 solar panels and 14 inverters, spread across five building rooftops.
21 March 2022
Game-changing way to manage assets in remote locations
Yurika is changing the way utilities, businesses and councils will be able to collect data as well as monitor and manage assets and operations in remote locations.
3 February 2022
Building a world of opportunity with solar power solutions
Delivered the high voltage infrastructure for a 96,000 panel solar farm during a pandemic.
17 January 2022
Sub-metering solution for a 30-storey high-rise
We developed a sub-metering solution for the owner of a 30-storey high-rise that enabled them to measure and monitor the electricity consumption of each of their tenants.
17 January 2022
Connecting council services
We successfully increased our client’s data speed from between 2 and 10 Mbps to 1 to 10 Gbps.
17 January 2022
Remote medical access
Communicating via video link with a large hospital during the COVID-19 pandemic.
17 January 2022
Creating industry-leading metering technology for a marine environment
Yurika developed an innovative and cost-effective metering solution to record the electricity and water consumption of berthed vessels at port.
17 January 2022
Information portal for a national hotel chain
Yurika provided a solution for a national hotel chain, with nearly 40 sites across Australia, that specified how much gas and water was being used at each hotel so they could meet their compliance reporting obligations.
17 January 2022
Integrating renewable energy into remote communities
We delivered a renewable energy solution featuring secure remote monitoring capabilities that was integrated with the local power station and across multiple remote site.
17 January 2022
Substation delivered in 14 weeks
Typically, a solar farm substation project takes 12 months from design through to commissioning - this project had only 14 weeks.
17 January 2022
Future proofing Cowboys Leagues Club
Yurika’s innovative design and cutting-edge smart solar technology helped the Cowboys Leagues Club tackle its energy costs and reduce their carbon footprint.